Name of the project:-Cryogenic Insulation LNG Rundown Metering Skid train 8 and 9
Year:-2024
Scope of works:-PIR Insulation and Aluminum cladding for pipe & fittings (-145ºC)
Name of the project:-Cryogenic Insulation LNG Rundown Metering Skid train 8 and 9
Year:-2024
Scope of works:-PIR Insulation and Aluminum cladding for pipe & fittings (-145ºC)
Name of the project:-FPSO ATLANTA FOR ENAUTA OFFLOADING CRUDE OIL METERING SKID & CRUDE OIL RUNDOWN METERING SKID
Year:-2024
Scope of works:-Rock wool Insulation and SS316 Cladding for Pipe and fittings
Name of the project:-MELEIHA PHASE II – NEW GAS TREATMENT PLANT (EPF)
Year:-2024
Scope of works:-Rock wool Insulation and Aluminum cladding for 3 Vessels Personnel Protection works with SS Wire Mesh for 2 Vessels
Name of the project:-LNG Sampling Skid – 2 Nos
Year:-2024
Scope of works:-Cryogenic Insulation with PIR and SS316 cladding (-41ºC)
Name of the project:-ESCRAVOS-Lagos Pipeline System Phase III Midline Compression Project
Year:-2024
Scope of works:-Rock wool Insulation & Alumnized Steel Cladding on Vessels, pipe & fittings Personnel Protection works with Perforated sheets on Pipe & fittings
Name of the project:-Thermo Design Engg (TDE)
Year:-2023
Scope of works:-Rock wool Insulation and Aluminum cladding for 126 Nos Vessels
Name of the project:-Heat Exchanger Vessel for Halliburton
Year:-2023
Scope of works:-Rock wool Insulation and Aluminum cladding
Name of the project:-Jurassic Production Facility- KOC Project
Year:-2023
Scope of works:-Rock wool Insulation & Aluminum cladding & PIR Insulation & aluminum cladding – 28 Vessels, columns and 20 Skids